We produce offshore containers:

  • Model 2543 (cuttings container)
    Designed for temporary storage and transportation of drilling waste products (drilling cuttings, drilling waste water and spent drilling mud, both water-based and carbon-based) by water, rail and road.
  • Model 2549 (10 ft. container)
    Designed for the transport and storage of packaged and piece goods by water, rail and road.
  • Model 2550 (basket container with side doors)
    Designed for the transport and storage of metal drums (8 drums, 2 drums per euro pallet) and other packaged and piece goods by water, rail and road.
  • Model 2551 (basket container with a ramp)
    Designed for transportation and storage of technological equipment and other packaged and piece goods by water, rail and road transport.
  • Model 2552 (basket container with end door)
    Designed for transportation and storage of technological equipment and other unit loads by water, rail and road transport.

Containers are transported in accordance with the transport and lashing regulations that apply to the particular mode of transport.

All containers are designed and comply with following requirements: EN 12079-1:2006; EN 12079-3:2006; Part VII of the Container Manufacture Regulations; Regulations of technical maintenance of the containers in operation; Regulations of Classification and Building of Sea Vessels; Parts XIII «Materials» and XIV «Welding»; IMO MSC/Circ. 860: Guidelines for the Approval of Offshore Containers Transferred at Sea.

A comparison of the characteristics of offshore containers:

Model25432549255025512552
Length, mm22022991367060002991
Width, mm18422438159424402438
Height, mm16002591163013001280
Weight (without slings), kg1750±2%2700±2%1600±2%3150±2%1700±2%
Load capacity, kg9250780049001085010000
Maximum gross weight, kg110001050065001400011700
Useful volume, m34,08136,512,15,9
Operating temperature, °C +30…-40+30…-40+30…-40+40…-40+40…-40

Our pattern of work

null

1. Application

We are waiting for your application with basic parameters of the order.
null

2. Estimate

We prepare an estimate on the basis of the application.
null

3. Prepayment

In the third step, we sign the contract and wait for the prepayment.
null

4. Performance

After prepayment, we carry out the work under the contract.
null

5. Handover-acceptance of the order

After the work is completed, you check the result.
null

6. Postpayment

Once your order is turned in, you pay the remaining invoices.
null

7. Satisfied customer

Our phasing of the work involves taking the client’s opinion into account.